The result
A 69 kWp commercial solar and battery system designed to reduce operating costs for a dairy farm using approximately 42,000 kWh of electricity a year.
The system is estimated to generate 64,516 kWh annually, reduce electricity costs by around 64% and deliver an approximate £11,300 financial benefit in year one, with a five-year payback.
At a glance
Location
Sector
Agriculture – dairy farming
System Size
69 kWp
Panels
150 × 460W AIKO Neostar
Battery Storage
2 × Fox ESS EP12 – approx. 23 kWh total
Existing Use
Approx. 42,000 kWh
EST. Generation
64,516 kWh
Est. Year-one Benefit
Approx. £11,300
Est. Payback
5 years
Est. CO₂ Reduction
13,358 kg per year
EST. costs reduction
64%
Est. solar used on site
58%
The client’s objective
The farm was using approximately 42,000 kWh of electricity each year, with significant daytime demand from farming machinery.
The client wanted to use solar generation to reduce those operating costs and become less reliant on grid electricity.
Battery storage was also included so that a proportion of the electricity generated during the day could be retained for use during the evening and early morning.
The project was financed through one of Phase Energy’s finance partners.
The Phase Energy solution
We designed a 69 kWp commercial solar PV system using 150 AIKO Neostar 460W panels.
The south-facing farm building provided the principal roof area for the installation and allowed the system to be designed around the site’s electricity consumption.
The array was paired with a Fox ESS 50kW V Series inverter and two Fox ESS EP12 batteries, providing approximately 23 kWh of storage.
This gives the farm the ability to use solar electricity directly during periods of high daytime demand while storing surplus generation for use later.
Why the system was designed this way
The system was designed around the farm’s existing electricity consumption, with Phase Energy aiming to apply for the maximum generation capacity available through a standard G99 application.
The south-facing barn roof provided the most suitable area for the solar array.
Battery storage was deliberately sized to provide a substantial starting capacity without unnecessarily oversizing the system. Further storage can potentially be added later if monitoring of the farm’s consumption demonstrates a benefit.


Installation
The main challenge on this project was maintaining access to the cattle housing barn throughout the installation.
Scaffolding was required around a building that still needed to remain operational, so access routes for livestock and normal farm activity had to be considered carefully.
Phase Energy, the client and the scaffolding contractor coordinated the access arrangements before work began, helping ensure that the installation could proceed without creating major obstructions to day-to-day farming operations.
The project was completed over one week.
Predicted energy and financial performance
Estimated annual generation
64,516 kWh
Existing annual electricity use
Approx. 42,000 kWh
Estimated solar generation used on site
Approx. 58%
Estimated reduction in electricity costs
Approx. 64%
Estimated year-one financial benefit
Approx. £11,300
Estimated payback
5 years
Estimated CO₂ reduction
13,358 kg per year
The projected financial benefit combines the value of solar electricity used directly on site with other applicable energy savings or export income.
These figures are proposal-stage estimates rather than guarantees. Actual performance will depend on weather conditions, farm electricity demand, tariffs and battery operation.
Finance
The installation was financed through one of Phase Energy’s finance partners.
This enabled the business to proceed with a sizeable solar and battery installation while spreading the investment rather than funding the full project directly at installation.
Additional project photography


More Commercial Solar Projects
See some more examples of happy client projects below
-

Solar & Battery Installation for Madginford Hall, Maidstone
Designed to cover 86% of annual electricity use with whole-hall backup.
-

Commercial Solar Installation for Montgomorie & Son Ltd, Billericay, Essex
Estimated to deliver £5,232 in year-one benefit with a four-year payback.
-

Commercial Solar Installation for Notgrove Holidays, Cheltenham
Estimated to deliver £9,029 in year-one benefit with future battery expansion built in.