The result
A 71.76 kWp commercial solar installation designed as the first phase of a larger renewable energy project at Frith Farm.
With the site using approximately 150,000 kWh of electricity a year, the system is predicted to generate 66,039 kWh annually, deliver an estimated £13,552 financial benefit in year one and achieve a four-year payback.
At a glance
Location
Sector
Agriculture / Food Production
System Size
71.76 kWp
Panels
156 × 460W AIKO Neostar
inverters
3 × Fox ESS T Series
Existing Use
Approx. 150,000 kWh
EST. Generation
66,039 kWh
Est. Year-one Benefit
Approx. £13,552
Est. Payback
4 years
Est. CO₂ Reduction
13,673 kg per year
Demand Covered
Approx. 35%
Est. solar used on site
Approx. 75%
The client’s objective
Frith Farm was using approximately 150,000 kWh of electricity each year, making energy costs a significant operating expense.
The initial objective was therefore straightforward: generate substantially more electricity on site, reduce reliance on grid power and bring down the farm’s ongoing energy costs.
The scale of the site also presented an opportunity to think beyond a single installation and consider how solar could potentially be expanded across several farm buildings over time.
The Phase Energy solution
Phase Energy installed a 71.76 kWp commercial solar PV system using 156 AIKO Neostar 460W panels across three buildings.
The installation uses three Fox ESS T Series inverters.
One of the selected barns did not previously have an electrical supply suitable for the solar connection, so the project included a new feed from the main supply using a substantial armoured cable. The necessary groundworks were carried out by the client as agreed before installation.
Why the system was designed this way
The original concept was considerably larger and explored the potential to use most of the nine or ten suitable buildings across the site.
Phase Energy initially applied to the DNO for approximately 150 kW of generation. Following the grid response, the project was reviewed with the client and it was agreed to begin with solar across three buildings.
This 71.76 kWp installation is therefore effectively phase one of what could eventually become a larger site-wide solar project.
The current system allows the client to assess the practical and financial performance of the installation before deciding whether to expand generation onto additional buildings in the future, subject to the relevant DNO permissions at that time.


Installation
The installation took approximately five days and no major installation difficulties were recorded.
Additional electrical infrastructure was required to provide a suitable feed to one of the barns, with Phase Energy incorporating the required armoured cable into the project and the client undertaking the associated groundworks.
Before committing to the project, the client also visited another commercial installation completed by Phase Energy, giving them an opportunity to see a working system and the standard of installation first-hand.
Predicted energy and financial performance
Existing annual electricity use
Approx. 150,000 kWh
Estimated annual generation
66,039 kWh
Estimated electricity demand covered by solar
Approx. 35%
Estimated generation used on site
Approx. 75%
Estimated generation exported
Approx. 25%
Estimated year-one financial benefit
Approx. £13,552
Estimated payback
4 years
Estimated CO₂ reduction
13,673 kg per year
The farm’s relatively high electricity consumption means a substantial proportion of the solar electricity generated is expected to be used directly on site rather than exported.
These figures are proposal-stage estimates rather than guarantees. Actual generation, savings and export levels will depend on weather conditions, operating patterns, electricity prices and the farm’s consumption profile.
Finance
Funding for the project was arranged independently by the client.
A potential first phase of a larger project
One of the most interesting aspects of this installation is its potential for future expansion.
The wider site offers considerably more suitable roof space than has been used during this first phase. Subject to system performance, future requirements and DNO approval, further buildings could potentially be incorporated into a later phase.
This gives Frith Farm the ability to increase its renewable generation progressively rather than having to commit to the maximum possible installation immediately.
More Commercial Solar Projects
See some more examples of happy client projects below
-

Commercial Solar Installation for Britelite Windows, Maidstone
A commercial solar system predicted to generate 45,802 kWh a year with a 3–4 year…
-

Commercial Solar Installation for a Farm in Malton, North Yorkshire
Estimated to generate 21,259 kWh a year with a five-year payback.
-

Solar & Battery Installation for Madginford Hall, Maidstone
Designed to cover 86% of annual electricity use with whole-hall backup.